Technical rider

  • Music equipment: For our play we need 2 loudspeakers, amplifier and audio mixer, which can operate with a laptop or Mp3. Active speakers are desired.
  • Building up and setting: about 7 hours, optimally would be one day earlier on the space.
  • Building down: about 5 hours
  • Playing time: 45 min.
  • Play Area: At least 10 mt. wide x 6 mt. low x 4 mt. high